850 kWp Rooftop Plant for a Textile Unit

A metal-sheet rooftop plant offsetting a large share of the factory's daytime load.

Project capacity

850 kWp

Location

Howrah, West Bengal

System type

On-Grid · Metal-sheet rooftop

Commissioned

November 2025

Energy generation

11,90,000 kWh / yr

Customer savings

₹95.00 L / yr

Client: Textile manufacturer (SAMPLE)

The challenge

The client's ageing metal-sheet roof and three-shift operation required a lightweight structure that wouldn't void the roof warranty and a phased install that wouldn't stop production.

Our solution

We designed a rail-less, seam-clamped structure with no roof penetrations, split the plant into four blocks for phased commissioning and integrated it with the existing HT panel and DG synchronisation.

Results

  • Commissioned in 9 weeks with zero production downtime
  • Payback estimated under 4 years
  • ≈ 860 tonnes of CO₂ avoided every year

Project gallery

850 kWp Rooftop Plant for a Textile Unit — photo 1
850 kWp Rooftop Plant for a Textile Unit — photo 2
850 kWp Rooftop Plant for a Textile Unit — photo 3
All projects

Let's design your solar plant

Book a free site assessment — our engineer will survey your property and share a detailed proposal.

WhatsApp Call