
Solar EPC
Turnkey Engineering, Procurement & Construction — one accountable partner from survey to switch-on.
Why choose Zolar for solar epc
Our EPC practice takes complete ownership of your solar plant: detailed engineering, tier-1 procurement, safe construction, testing and grid synchronisation. You get a single contract, a single point of accountability and a plant engineered for 25+ years of bankable generation.
- Single-window responsibility from feasibility to commissioning
- PVsyst-based yield simulation and shadow analysis
- Structural design certified for local wind zones
- Tier-1 modules and inverters with OEM warranties
- Quality checks at every milestone with photo documentation
- DISCOM liaison, net metering and CEIG approvals
What's included
Engineering
Site survey, load analysis, PVsyst simulation, SLD, structural & electrical design, BOQ.
Procurement
Tier-1 modules, string/central inverters, ACDB/DCDB, cables and structures sourced with factory QA.
Construction
Civil and structure works by trained crews following IS/IEC standards and strict safety plans.
Installation
Module mounting, string wiring, earthing, lightning arrestors and remote monitoring setup.
Testing
IV-curve tracing, insulation resistance, earth resistance and thermography before energisation.
Commissioning
Grid synchronisation, performance-ratio verification and handover with O&M manuals.
Ideal for

“A solar plant is a 25-year promise. We engineer it like one.”
— The Zolar promise
Free solar calculator
How much will you save with solar?
Get your recommended system size, subsidy, payback period and 25-year savings in under 60 seconds.
Questions? We've got answers.
Everything you need to know about going solar — costs, subsidy, approvals and maintenance.
For homes, an on-grid system typically costs ₹55,000–₹70,000 per kW before subsidy, depending on brand, structure height and site conditions. Commercial and industrial systems cost less per kW thanks to scale. Use our solar calculator for an instant estimate, then book a free site assessment for an exact quote.
Residential consumers get ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW — up to ₹78,000 for systems of 3 kW and above. Special-category states and UTs receive higher amounts. Housing societies can also claim support for common facilities. We file and track your subsidy end to end.
Roughly 80–100 sq. ft of shadow-free area per kW. A 5 kW home system needs about 400–500 sq. ft. Elevated structures let you keep using the terrace underneath.
Homes typically recover their investment in 3–5 years after subsidy, and commercial users in 3–4 years thanks to higher tariffs. With panels lasting 25+ years, you enjoy two decades of nearly free electricity.
No — for safety, on-grid inverters shut down when the grid fails so no power flows back to linemen. If you need backup, choose a hybrid system with batteries, which keeps critical loads running automatically.
Tier-1 modules come with a 25–30 year performance warranty and typically degrade only ~0.5% a year. Inverters usually last 10–15 years.








